Publications (Google Scholar Profile)

Journal Papers

  1. Ying Wang, Jinying XU, Junying Liu*, Yunlong Li (2024). “Turning Pressure into Power: The Configuration Effect of Antecedents on the Digital Transformation of Engineering Enterprises”. Journal of Management in Engineering, 40(1), 04023059. (Link).
  2. Jinying XU, Jinfeng Lou*, Weisheng LU (2023). “Ensuring construction material provenance using Internet of Things and blockchain: Learning from the food industry”. Journal of Industrial Information Integration, 33, 100455. (Link).
  3. Jinying XU*, Weisheng LU (2023). “How Does Hierarchy Steepness Affect Coordination in Project-Based Organizations? A Social Network Analysis”. Project Management Journal, 54(3), 306-321. (Link).
  4. Liupengfei WU, Xiao LI*, Rui ZHAO, Weisheng LU, Jinying XU, & Fan XUE (2022). “A Blockchain-based Model with an Incentive for Cross-border Logistics Supervision and Daa Sharing in Modular Construction”. Journal of Cleaner Production, 375. (Link).
  5. Jinying XU*, Weisheng LU, Liupengfei WU, Xiao LI, & Jinfeng LOU (2022). “Balancing privacy and occupational safety and health in construction: A blockchain-enabled P-OSH deployment framework”. Safety Science, 154, 105860. (Link).
  6. Jinying XU* & Weisheng LU (2022). “Developing a Human-Organization-Technology Fit (HOT) model for information technology adoption in organizations”. Technology in Society, 70, 102010. (Link).
  7. Weisheng LU, Frank Ato GHANSA*, & Jinying XU (2023). A category and index hybrid (CIH) approach to measuring the levels of prefabrication. International Journal of Construction Management. (Link).
  8. Weisheng LU, Liupengfei WU*, Jinying XU, & Jinfeng LOU (2022). Construction E-Inspection 2.0 in the COVID-19 Pandemic Era: A Blockchain-Based Technical Solution. Journal of Management in Engineering, 38(4), 04022032. (Link).
  9. Jinfeng LOU, Weisheng LU, Jinying XU*, Xiao LI, & Jing WANG (2022). “Nomenclature for offsite construction”. Building Research & Information. (Link).
  10. Ruibo HU, Ke CHEN, Weili FANG, Linzi ZHENG, & Jinying XU (2022). “The technology-environment relationship revisited: Evidence from the impact of prefabrication on reducing construction waste”. Journal of Cleaner Production, 341, 130883. (Link).
  11. Maosu LI, Yi PENG, Yijie WU, Jinying XU, Tan TAN, Hui GUO, LWeisheng LU, Gar-On YEH, & Fan XUE (2022). “Role of the built environment in the recovery from Covid-19: Evidence from a GIS-based natural experiment on the city blocks in Wuhan, China”. Frontiers Built Environment, 7:813399. (Link).
  12. Liupengfei WU, Weisheng LU, Rui ZHAO, Jinying XU, Xiao LI, & Fan XUE (2022). “Using blockchain to improve information sharing accuracy in the on-site assembly of modular construction”. Journal of Management in Engineering, 38(3), 04022014. (Best Paper Award)(Link).
  13. Liupengfei WU, Weisheng LU, & Jinying XU. (2022). “Blockchain-based smart contract for smart payment in construction: A focus on the payment freezing and disbursement cycle”. Frontiers in Engineering Management,9, 177–195.(Link).
  14. Jinying XU*, Weisheng LU, & Eleni PAPADONIKOLAKI. (2022). “Human-Organization-Technology Fit Model for BIM adoption in Construction Project Organizations: Impact factor analysis using SNA and comparative case study”. Journal of Management in Engineering. (Link).
  15. Xiao LI, Weisheng LU, Fan XUE, Liupengfei WU, Rui ZHAO, Jinfeng LOU, & Jinying XU (2022). “Blockchain-enabled IoT-BIM Platform (BIBP) for Supply Chain Management in Modular Construction”. Journal of Construction Engineering Management, 148(2), 04021195. (Link).
  16. Weisheng LU, Wendy M. Lee, Fan XUE, & Jinying XU (2021). “Revisiting the effects of prefabrication on construction waste minimization: a quantitative study using bigger data”. Resources, Conservation and Recycling, 170, 105579. (Link).
  17. Jinying XU, Meng YE, Weisheng LU, Zhikang BAO, & Chris WEBSTER. (2020). “A four-quadrant conceptual framework for analyzing extended producer responsibility in offshore prefabrication construction”.Journal of Cleaner Production, 124540. (Link).
  18. Jinying XU, Weisheng LU, Meng YE, Chris WEBSTER, & Fan XUE. (2020). “An anatomy of waste generation flows in construction projects using passive bigger data”. Waste Management, 106, 162-172.(Link).
  19. Jinying XU, Weisheng LU, Meng YE, Fan XUE, Xiaoling ZHANG, & Billy F.P. LEE. (2020). “Is the private sector more efficient? Big data analytics of construction waste management sectoral efficiency”. Resources Conservation and Recycling, 155, 104674.(Link).
  20. Weisheng LU, Jinying XU*, Jonas Söderlund. (2019). “Exploring the effects of building information modelling (BIM) on projects: A longitudinal social network analysis”. Journal of Construction Engineering and Management. 146(5), 04020037.(Link).
  21. Jinying XU*, Weisheng LU, Fan XUE, & Ke CHEN. (2019). “‘Cognitive facility management’: definition, system architecture, and example scenario”. Automation in Construction. 107, 102922.(Link).
  22. Jinying XU*, Ke CHEN, Anna ZETKULIC, Fan XUE, Yuhan NIU, & Weisheng LU (2019). “Pervasive sensing technologies for facility management: A critical review”. Facilities. 38(1/2), 161-180.(Link).
  23. Jinying XU, Weisheng LU, Fan XUE, Ke CHEN, Meng YE, Jing WANG, & Xi CHEN. (2018). “Cross-boundary collaboration in waste management research: a network analysis”. Environmental Impact Assessment Review, 73, 128-141.(Link).
  24. Tan Tan, Weisheng Lu, Gangyi Tan, Fan XUE, Ke CHEN, Jinying XU, Jing Wang, & Shang Gao. (2020). “Construction-Oriented Design for Manufacture and Assembly (DfMA) Guidelines”. Journal of Construction Engineering and Management, 146(8), 04020085. (Link).
  25. Weisheng LU, Tan Tan, Jinying XU, Jing WANG, Ke CHEN, Shang GAO, & Fan XUE. (2020). “Design for Manufacture and Assembly (DfMA) in construction: the old and the new”. Architectural Engineering and Design Management, 1-15. (Link).
  26. Xi CHEN, Weisheng LU, Fan XUE, & Jinying XU. (2018). “A cost-benefit analysis of green buildings with respect to construction waste minimization using big data in Hong Kong”. Journal of Green Building, 13(4), 61-76.(Link).
  27. Yun LE, Jinying XU*, Ju BAI. (2016). “Evolutionary Analysis of Mega Infrastructure Investment and Finance Scheme in China from the Perspective of Institutional Transition”. Journal of Tongji University (Natural Science), 44(8), 1272-1278. (In Chinese).(Link).
  28. Jian CHEN, Lei SUN, Jinying XU, & Tianheng CHEN. (2013). “Engineering management education inspired by the idea of achievement system. Science & Technology Progress and Policy”. 30(23), 117-119. (In Chinese).(Link).

Conference Papers

  1. Jinying XU,Kristen MacAskill. (2023). A carbon data trustworthiness framework for the construction sector. In EC3 Conference 2023. Crete, Greece. (Link).
  2. Jinying XU, Zhongze YANG, Weisheng LU, & Fan XUE. (2021). Impacts of the COVID-19 Pandemic on construction industry: a comparison between Hong Kong and Singapore. In The 26th International Symposium on the Advancement of Construction Management and Real Estate. Beijing, China.
  3. Jinfeng LOU, Jinying XU, Weisheng LU, & Fan XUE. (2021). A generic framework for BIM component naming. In The 26th International Symposium on the Advancement of Construction Management and Real Estate. Beijing, China.
  4. Frank Ato GHANSAH, Weisheng LU, & Jinying XU. (2021). Cognitive Modular Building to Enhance User Wellbeing: An Insight from Literature Review on Potential Design Considerations and Benefits. In The 26th International Symposium on the Advancement of Construction Management and Real Estate. Beijing, China.
  5. Jinying XU*, & Weisheng LU. (2020). The Iron Triangle of BIM adoption in construction project organizations. In The 25th International Symposium on the Advancement of Construction Management and Real Estate. Wuhan, China. (Outstanding Paper Award)
  6. Jinying XU, Fan XUE, Alain CHIARADIA, & Weisheng LU. (2020). Indoor-outdoor navigation with no beacons: Compensating smartphone AR positioning errors with 3D pedestrian network. In Construction Research Congress 2020, Tempe, USA.(Link)
  7. Jinying XU*, Weisheng LU, & Ke CHEN. (2019). How do different professionals collaborate in construction projects? A social network analysis perspective. In The 24th International Symposium on the Advancement of Construction Management and Real Estate. Chongqing, China. (Excellent Paper Award)
  8. Jinying XU*, Weisheng LU, & Ling Hin LI. (2019). Cognitive Facilities Management: Definition and Architecture. In International Conference of Smart Infrastructure and Construction 2019. Cambridge, UK.(Link)
  9. Jinying XU*, Weisheng LU, & Jing WANG. (2019). The Gateway to Integrating User Behavior Data in “Cognitive Facility Management”. In The 4th International Conference on Civil and Building Engineering Informatics (ICCBEI 2019). Sendai, Japan.(Link)
  10. Jinying XU*, & Weisheng LU. (2019). Design for construction waste management. In The 2nd International Conference on Sustainable Buildings and Structures (ICSBS 2019). Suzhou, China.(Link)
  11. Jinying XU*, & Weisheng LU. (2018). Smart construction from head to toe: A closed-loop lifecycle management system based on IoT. In Construction Research Congress 2018, New Orleans, USA.(Link)
  12. Jinying XU*, Ke CHEN, Fan XUE, & Weisheng LU. (2018). 3D point cloud data enabled facility management: A critical review. In The 23rd International Symposium on the Advancement of Construction Management and Real Estate. Guiyang, China.(Link)
  13. Jing WANG, Weisheng LU, & Jinying XU. (2019). Modeling the Last-Mile Problem of BIM Adoption. In The 4th International Conference on Civil and Building Engineering Informatics (ICCBEI 2019). Sendai, Japan.(Link)
  14. Fan XUE, Alain CHIARADIA, Chris WEBSTER, Diandian LIU, Jinying XU, & Weisheng LU. (2018). Personalized walkability assessment for pedestrian paths: An as-built BIM approach using ubiquitous augmented reality (AR) smartphone and deep transfer learning. In The 23rd International Symposium on the Advancement of Construction Management and Real Estate. Guiyang, China.(Link)

Book Chapters

  1. Weisheng LU & Jinying XU. “36. Big data analytics and project organizing” In Research Handbook on Complex Project Organizing (2022) edited by Graham Winch, Maude Brunet, and Dongping Cao, Edward Elgar Publishing Limited.
  2. Jinying XU*, & Weisheng LU. “BIM, Smart Construction Objects (SCOs) and Pervasive Technologies Integration” in Research Companion to Building Information Modeling (2022), edited by Prof. Wilson Lu and Prof. Chimay Anumba, Edward Elgar Publishing Limited. (Peer-reviewed)(Coming Soon)
  3. Jinying XU*, Weisheng LU, & Yuhan NIU. “Chapter 15 From Smart Construction objects towards Cognitive FM” in Cyber-Physical Systems in the Built Environment (2020), edited by Prof. Chimay Anumba, Taylor & Francis. (Peer-reviewed). (Link)
  4. “Chapter 7 Current Challenges and future outlooks” in BIM and Big Data for Construction Cost Management(2019), edited by Weisheng Lu, Chi Cheung Lai, and Tung Tse, Routledge.(Link)
  5. Section 1, 2, 5 and 6 of Design, Construction, and Management of Hospital Reconstruction and Expansion Projects(2017), edited by Jinhua Wu and Yun Le, Tongji University Press, Shanghai. (In Chinese)(Link)
  6. Chapter 2, 3, and 5 of Hospital Construction Project Management: Government Public Engineering Project Management Reform and Innovation(2015), edited by Jianzhong Zhang and Yun Le, Tongji University Press, Shanghai. (In Chinese)(Link)